ArIED 61850 Documentation
This directory contains the engineering, validation, licensing, provenance, and operating-boundary documents for the ArIED 61850 Windows application.
Document
Purpose
Project README
Product overview, feature summary, quick start, build instructions, and public claim boundary.
Architecture
Multi-IED ownership, model identity, report-first acquisition, runtime scaling, and timestamp semantics.
GOOSE Subscriber
Read-only Npcap capture, ARIEC61850 GOOSE decoding, SCL/live-discovery DataSet binding, ordered allData leaf semantics, diagnostics, and field validation.
Validation checklist
Discovery, reporting, monitoring, recovery, and control acceptance checks.
UI validation
Windows scaling, keyboard workflow, accessibility, multi-IED, and command-panel checks.
Engine compatibility
Required ARIEC61850 source contracts and project-reference layout.
Application workflow and progress records
Public documentation should:
distinguish configured SCL context from the live MMS model;
distinguish protocol readiness from switching authority and operational safety;
state whether evidence comes from unit tests, loopback, simulator, laboratory IEDs, or field use;
avoid universal interoperability or conformance claims;
use synthetic or contributor-owned examples;
exclude confidential customer, employer, station, credential, and project material.