Skip to content

Pull requests: openshift/origin

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Create more test bucket to debug high cpu issues approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31377 opened Jul 9, 2026 by xueqzhan Contributor Loading…
OCPBUGS-87079: Add polling and longer waits in the EgressFirewall tests to avoid flakiness jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31376 opened Jul 9, 2026 by arkadeepsen Member Loading…
Add e2e test to detect named ports in NetworkPolicies ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31375 opened Jul 9, 2026 by machine424 Contributor Loading…
[release-4.21] OCPEDGE-2274: fix: change arbiter topology test to verify pods do not run on arbiter nodes ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31374 opened Jul 9, 2026 by openshift-cherrypick-robot Loading…
WIP: Ensure Platform Prometheus targets are not scraped with insecure_skip_verify approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31373 opened Jul 9, 2026 by machine424 Contributor Loading…
chore(extended/prometheus): reduce targets-auth skip list and handle mTLS approved Indicates a PR has been approved by an approver from all required OWNERS files. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31372 opened Jul 9, 2026 by machine424 Contributor Loading…
TRT-2689: Add devcontainer, APM config, and agentic CI scaffolding approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review verified Signifies that the PR passed pre-merge verification criteria
#31371 opened Jul 8, 2026 by smg247 Member Loading…
MON-1157: Test metrics for prometheus best practice approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31370 opened Jul 8, 2026 by jan--f Contributor Loading…
OCPBUGS-97965: oc adm inspect test fails due to partial pod log collection errors in… approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31369 opened Jul 7, 2026 by xueqzhan Contributor Loading…
OCPBUGS-97822: test/router: retry http2 test when response comes from wrong router approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31367 opened Jul 6, 2026 by mkowalski Contributor Loading…
OCPBUGS-96581: alerting: allow KubeCPUOvercommit on compact clusters approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31365 opened Jul 3, 2026 by jan--f Contributor Loading…
OCPBUGS-84518: Remove exception for servicemesh-operator3 pod do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31364 opened Jul 3, 2026 by racheljpg Draft
OCPBUGS-97597: use unique usernames in parallel OAuth tests approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31363 opened Jul 2, 2026 by xueqzhan Contributor Loading…
CNTRLPLANE-2157: Migrate tests of Prometheus, Audit and TLS to OTE jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#31360 opened Jul 1, 2026 by YamunadeviShanmugam Contributor Loading…
OCPBUGS-84513: remove openshift-cluster-version terminationMessagePolicy exemption jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31359 opened Jun 30, 2026 by jrangelramos Member Loading…
2 tasks
OCPBUGS-84517: Remove stale openshift-marketplace terminationMessagePolicy exemption jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31355 opened Jun 30, 2026 by jrangelramos Member Loading…
[release-4.21] OCPBUGS-94117: support Parents field on origin test suites jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31354 opened Jun 30, 2026 by openshift-cherrypick-robot Loading…
OCPBUGS-85696: Adding logs and exponential backoff on execPod approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/severity-moderate Referenced Jira bug's severity is moderate for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review verified Signifies that the PR passed pre-merge verification criteria
#31352 opened Jun 30, 2026 by jcmoraisjr Member Loading…
CNTRLPLANE-3652: Add TLS ownership for 5 unowned artifacts jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review vendor-update Touching vendor dir or related files
#31348 opened Jun 29, 2026 by oceanc80 Contributor Loading…
NO-JIRA: Replace a bug id: 25739 -> 92835 approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review verified Signifies that the PR passed pre-merge verification criteria
#31345 opened Jun 26, 2026 by hongkailiu Member Loading…
OCPBUGS-92837: test/router: wait for all per-route metrics before asserting approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31344 opened Jun 26, 2026 by mkowalski Contributor Loading…
Add network observability e2e tests ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31342 opened Jun 25, 2026 by kapjain-rh Loading…
2 tasks done
CNTRLPLANE-3741: PKI config tests for service-ca and kube-apiserver-operator jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31341 opened Jun 25, 2026 by kaleemsiddiqu Loading…
Fix longrunning suite for node test cases do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#31339 opened Jun 25, 2026 by ngopalak-redhat Contributor Loading…
e2e: move AdminKubeClient() from init to BeforeEach in router config_manager test approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31335 opened Jun 24, 2026 by redhat-chai-bot Contributor Loading…
ProTip! Mix and match filters to narrow down what you’re looking for.