feat: load all dependencies in worker #1156
ci.yml
on: push
python
/
ruff-format
16s
python
/
ruff-lint
19s
python
/
mypy
31s
python
/
build
18s
lint-qppe
26s
Matrix: python / pytest
Annotations
8 errors
|
python / ruff-lint
Process completed with exit code 1.
|
|
Ruff (C901):
questionpy_server/worker/runtime/manager.py#L166
questionpy_server/worker/runtime/manager.py:166:9: C901 `on_msg_load_qpy_package` is too complex (14 > 10)
|
|
python / pytest (3.13)
The job has exceeded the maximum execution time of 6h0m0s
|
|
python / pytest (3.13)
The operation was canceled.
|
|
python / pytest (3.12)
The job has exceeded the maximum execution time of 6h0m0s
|
|
python / pytest (3.12)
The operation was canceled.
|
|
python / pytest (3.12)
Event loop is closed
|
|
python / pytest (3.12)
Event loop is closed
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
build
Expired
|
173 KB |
sha256:e1b0b21087d9ec67cfa120c88eb28db917b8e217fa64a53f9655ab6373ca9cc9
|
|